DECISION No 124
of The Cabinet of Ministers of The Republic of Azerbaijan

On approval of sample of final protocol of tender commission about tender results

Baku, 2 August 2002

In order to provide implementation of paragraph 6 of article 1 of the Decree of the President of the Republic of Azerbaijan on application of the Law of the Republic of Azerbaijan “On public procurements” No. 668 of 29 January 2002, the Cabinet of Ministers of the Republic of Azerbaijan HEREBY RESOLVES:

1. To approve “sample of final protocol of tender commission about tender results” (attached).

2. Decision of the Cabinet of Ministers of the Republic of Azerbaijan “On sample of protocol of tender commission about tender result” and “On approval of sample of final contract” No. 87 of 12 May 2000 shall be considered null and void.

3. This decision takes effect from the day of its signing.

Prime Minister
of The Republic of Azerbaijan A. Rasizadeh




Approved by decision
of the Cabinet of Ministers
of The Republic of Azerbaijan
No. 124 of 02 August 2002

Sample of final protocol of tender commission about tender results

Produced in accordance with article 37.5 of the Law of the Republic of Azerbaijan “On public procurements” at procurement of goods (works and services) by state enterprises (administrations) and enterprises and organizations, state share in charter fund of which is 30% and more

Name of procurement agency

Address

Final protocol of tender commission about tender results


City (region) _________________ No. ____ Date ______________

1. Name of procured goods (works and services)

quantity (volume, weight or other measurement unit shall be indicated)

(if procured goods (works and services) are allocated to lots, final protocol of tender commission shall be produced separately for each lot)

2. Proposed price of procured goods (works and services)

(shall be indicated in manat or other currency)

3. Procurement method

4. Date ____________ and No ______ of decision about setting up of tender commission, manager of procurement agency or acting person


Composition of tender commission Full name Place of work and title
Chairman
Members

5. Publication of announcement about tender:

name of local organ of press_____________________ date of announcement_____________

name of international organ of press___________________date of announcement_________

6. Information about sending of personal invitations:

No Name of consignor (contractor) Country, address and bank details Date of sending of personal invitations and its registration number

7. Amount of tender participation fee____________________________________ manat, total amount of participation fees to be paid_____________________________ manat

8. Tender costs ___________________________ manat including on purposes:

a) manat
b) manat
c) manat

9. Information about consignors (contractors), which received collection of basic tender conditions and submitted tender proposals:

No Name of consignor (contractor) Country, address and bank details Date of receipt of collection of basic tender conditions Date and time of submission of tender proposal

10. Criteria provided in collection of basic tender conditions for assessment and comparison of tender proposals of tenderers as well as their relative price:

a) criteria determining qualification compliance of tenderer:

No Name of quantitatively assessed criteria Relative price of criteria

b) criteria reflecting technical and financial indices of tender proposal:

No Name of quantitatively assessed criteria Relative price of criteria

11. Preferential correction provided for in collection of basic tender conditions in favor of tender proposals of local manufacturers _____________

12. Results of consignors (contractors) qualification compliance determination (if such procedure was held)

No Name of criteria applied in assessment Relative price of criteria Price determined on criteria by tender commission to consignors (contractors)
Total

13. Time of opening of tender packages

Date _____________________________

Hour __________________________

If time of opening of tender packages was changed

Date _____________________________

Hour __________________________

14. At opening of tender packages, information announced with regard to tender proposals of tenderers

No Name of tenderer Price of tender proposal Price of alternative proposal Benefits provided in tender proposal

15. Compliance of tender proposals of consignors (contractors) with formal requirements:

No Criteria on formal requirements Requirements of collection of basic conditions Name of 1st consignor Name of 2nd consignor Name of 3rd consignor Etc.
1 2 3 4 5 6 7
1. Tender proposal validity
2. Availability of tender proposal’s guarantee yes/no (brief summary) yes/no (brief summary) yes/no (brief summary)
3. Validity of tender proposal’s guarantee
4. Amount of tender proposal’s guarantee
5. Authority of consig-nor (contractor)
6. Completeness of tender proposal
7. Information on com-pliance with other formal requirements set in collection of basic conditions and tender proposals

16. Reasons for exclusion of tender proposals, which are not in compliance with formal requirements of collection of basic tender conditions

No Name of tenderer Reason for exclusion

17. If all tender proposals are excluded, __________ date and _________No. of letter on approval of such decision by State Agency on procurement.


18. Information about correction of calculation errors in tender proposals:


19. Results of comparison and assessment of tender proposals:

No Assessment criteria Relative price Names of consignors (contractors) and prices on criteria

20. Information about tenderers, which has taken first, second and third places as a result of tender:

Places Name of tenderer Price of proposal Reason for allocation of places between tenderers
1st place
2nd place
3rd place

21. If tender proposals do not provide full performance of subject of tender, decision of tender commission on allocation of subject of tender between two or more tenderers and relevant justification reasons


22. Amount (in percents) provided for in basic conditions of guarantee for performance of procurement contract ______________________ .

23. Amount (in percents) of advance payment provided for in collection of basic conditions ________________.

24. Amount (in percents) of guarantee for advance payment ________________.

25. Information on insurance of risks with regard to guarantee of performance of procurement contract


26.Tender prosedurasının dayandırılması haqqında məlumat: dayandarılma müddəti______________ gün. əsası

26. Information on suspension of tender procedures:
suspension term _____________ days

reason

27. Information on cancellation of tender procedures:
cancellation date ________________

reason

28. Information on received complaints and results of their processing

29. Experts involved in work of tender commission (full name)

Chairman of tender commission


(full name) (place of work and title) (signature)

Members of tender commission

(Final protocol of tender commission shall be signed by all members of tender commission, members of commission, who disagree with decision, shall indicated their special opinions in the protocol)

(full name) (place of work and title) (signature)

Special opinions of members of tender commission disagreed with tender commission’s decision:


NOTE:

1. Copy of final protocol of tender commission about tender results shall be officially submitted to the State Agency on procurement within 3 (three) banking days after its signing.

2. Final protocol of tender commission shall give a basis to procurement agency to enter into procurement contract with consignor (contractor), which took first place as a result of assessment and comparison of tender proposals.

3. Failure of tender winner to sign procurement contract or provide guarantee for performance of the contract within terms as provided by legislation, shall be considered as its inability to perform its obligations and shall lead to non-returning of guarantee for tender proposal. If there are such cases, additional information shall be given to State Agency on procurement.